Odisha High CourtConstitutional LawCivil Procedure and Evidence

Orissa HC Upholds Refusal To Bar Another Cement Unit’s Heavy Vehicles From Railway Crossing Pending Trial

M/S. KAPILAS CEMENT MANUFACTURING WORKS(KCMW), CUTTACKv.MY HOME INDUSTRIES PVT. LTD., HYDERABAD

Orissa HC Upholds Refusal To Bar Another Cement Unit’s Heavy Vehicles From Railway Crossing Pending Trial. M/S. KAPILAS CEMENT MANUFACTURING WORKS(KCMW), CUTTACK vs MY HOME INDUSTRIES PVT. LTD., HYDERABAD. Odisha High Court. LawLens
The LawLens card for this judgmentXLinkedInWhatsApp

In brief

The question

1. Whether the concurrent orders refusing temporary injunction were affected by jurisdictional error, manifest perversity, or other infirmity warranting interference under Article 227

The court held

The Court held that no jurisdictional error, manifest perversity, or material irregularity justified Article 227 intervention.

It also directed

It dismissed the petition and left undisturbed the orders refusing temporary injunction

It clarified that refusal of an injunction did not confer an unrestricted right to use the crossing: the Collector’s safety conditions and applicable legal requirements remained binding

Any earlier interim order was vacated

01Facts

The petitioner, a lessee of industrial land, claimed that a pathway and railway level crossing within its leasehold premises were intended for villagers’ pedestrian and cattle use, not for the opposite party’s heavy industrial traffic. The opposite party, whose IDCO-allotted land it said was otherwise inaccessible, obtained a Collector’s order permitting IDCO and its allottees to use the crossing, subject to railway-safety precautions

¶ 2(iii)–(vi) · pp. 3–5

The petitioner challenged that order in a civil suit and sought a temporary injunction. The Trial Court refused the injunction, finding that the petitioner had not established balance of convenience or irreparable injury; the Appellate Court affirmed

¶ 2(vii)–(ix) · pp. 5–6

The petitioner then invoked Article 227

¶ 1 · p. 1

02Issues

i.1. Whether the concurrent orders refusing temporary injunction were affected by jurisdictional error, manifest perversity, or other infirmity warranting interference under Article 227

¶ 7 · p. 27

ii.2. Whether the petitioner established grounds for temporary restraint on the opposite party’s industrial use of the crossing, including a prima facie case, balance of convenience, and irreparable injury

¶ 11–13 · pp. 30–31

03Law Applied

Under Article 227, the High Court exercises supervisory, not appellate, jurisdiction and ordinarily cannot reappraise evidence or substitute its conclusions for those of subordinate courts; intervention is warranted for jurisdictional error, patent perversity, gross failure of justice, or disregard of fundamental legal principles (Shalini Shyam Shetty v. Rajendra Shankar Patil; Garment Craft v. Prakash Chand Goel)

¶ 8–10 · pp. 27–30

Under Order XXXIX Rules 1 and 2 CPC, temporary injunction requires a prima facie case, balance of convenience in the applicant’s favour, and likely irreparable injury; a prima facie case alone is insufficient (Dalpat Kumar v. Prahlad Singh)

¶ 11–13 · pp. 30–31

On appeal, a trial court’s discretionary injunction decision is not ordinarily displaced unless exercised arbitrarily, capriciously, or perversely, or contrary to settled principles (Wander Ltd. v. Antox India (P) Ltd.)

¶ 15 · p. 31

Provisions in the judgment · 1 · Linked ones open on LawLens

Railways Act, 1989 Section 151

04Reasoning

The Court treated the pathway’s character, the parties’ leasehold rights, alternative access, and compliance with railway and wildlife-related conditions as disputed matters requiring evidence at trial

¶ 17–19 · pp. 32–33 · ¶ 26–28 · pp. 36–37

The Collector’s order provided for precautions, consultation with Railway authorities for heavy machinery, and protection of the railway line; the Court held that the petitioner’s concerns about non-compliance did not establish that the lower courts’ refusal was perverse

¶ 20–21 · pp. 33–34

The Trial Court had considered the asserted access needs of the opposite party and local villagers against the petitioner’s apprehended injury, and the challenge to its finding about alternative access raised a factual dispute rather than demonstrating manifest perversity

¶ 22–25 · pp. 34–36

The High Court therefore declined to reweigh the evidence or substitute its view under Article 227

¶ 32–33 · pp. 39–40

05Holding

The Court held that no jurisdictional error, manifest perversity, or material irregularity justified Article 227 intervention.

¶ 36–37 · p. 41

It dismissed the petition and left undisturbed the orders refusing temporary injunction

¶ 36–37 · p. 41

It clarified that refusal of an injunction did not confer an unrestricted right to use the crossing: the Collector’s safety conditions and applicable legal requirements remained binding

¶ 35 · p. 40

Any earlier interim order was vacated

¶ 38 · p. 41
Odisha High Court

Original Court PDF

M/S. KAPILAS CEMENT MANUFACTURING WORKS(KCMW), CUTTACKvsMY HOME INDUSTRIES PVT. LTD., HYDERABAD

Odisha High Court · October 30, 2026

Click to open original judgment

Original judgment, available to read, download and summarize on LawLens.in